• 2017 February 6 10:35

    Eastern Shipbuilding delivers first US-flagged freezer processor factory trawler ARAHO

    Eastern Shipbuilding Group, Inc. on January 28, 2017 delivered the DNV Classed Factory Processor Fishing Trawler F/T ARAHO (Hull 175) to the O’Hara Corporation of Rockland, Maine. She is the first US Flag Freezer Processor Factory Trawler constructed in over 25 years. The F/T ARAHO will be in service in the waters of Alaska, the shipbuilder said in a press release.
     
    The O’Hara family and Eastern Shipbuilding are no strangers to each other. The F/T ARAHO is the sixth fishing vessel Eastern has built for the O’Hara family over the last 20 years.  This factory processor fishing trawler is far more sophisticated than the prior five vessels. The O’Hara and D’Isernia families go back to the early 1990’s with the F/V ENTERPRISE a Catcher Processor Conversion delivered in 1996. Between the years 2002-2005 four additional fishing vessels were delivered.
     
    The O'Hara family has been in the maritime industry for over a century.  Starting in Massachusetts, Francis J. O'Hara began building his sailing fleet in 1903; after four generations, the process continues.  The O’Hara fishing family has grown over the past century.  In 1978, Eastern Fisheries was created through a partnership between Frank O’Hara Sr. and Roy Enoksen. Today, Eastern Fisheries is one of the world’s largest scallop fleets and processes over 20% of the scallops consumed in the U.S.  Moving from generation to generation with fishing fleet operations on both the Atlantic and Pacific Oceans, in addition, O’Hara Corporation operates three catcher-processor vessels in the Bering Sea, Aleutian Islands and Gulf of Alaska. The O’Hara family also own and operate O’Hara Lobster Bait that has been supplying bait to lobsterman on the coast of Maine for over 65 years and Journey’s End Marina also located in Rockland Harbor, Maine which is the largest indoor boat storage facility in the state offering an array of services and vessel repairs.
     
    Launched July 31, 2015, the F/T ARAHO is a ST-115 design furnished by Skipsteknisk, AS of Aalesund, Norway.  The design dimensions and capacities are as follows:

    Length (LOA):  194’-0” (59.13m); Length (BP):  170’-0” (51.82m); Beam:  49’-0”   (14.94m); Depth (to main deck):  19’-4”  (5.90m); Depth (to trawl deck): - 28’-3”  (8.61m); Depth (to 1st deck):  36’-7”  (11.15m).

    The construction Classification Rules and Regulations are Det Norske Veritas (DNV) +1A1, Stern Trawler, E0 Notation for hull and DNV ICE 1B designed, outfitted and inspected for harsh cold environments.
     The vessel design has a highly efficient hull shape which reduces hull resistance and increasing fuel efficiency.
     The accommodation and interior outfitting is designed for 54 persons, excluding the hospital and completely insulated for the harsh working environment.  Marine Interior Systems of Covington, LA is Eastern Shipbuilding’s selected Joiner and Insulation sub-contractor for the vessel.  Our two companies continue to have a strong working relationship that has spanned over a decade.  
     
    The vessel is fully equipped with state of the art systems for bottom and pelagic trawling with single trawl. The winches are electrically driven and provided by Rapp Hydema, a well proven supplier of winch systems and are designed for regeneration of power.
     The main processing equipment, in the enclosed factory will consist of various types of fish heading machines and factory systems, consisting of transport systems, fish grader, storage tanks, weighing graders, weighing system, packing tables, packing machine, automatic horizontal freezer system H1, block elevators, etc.  The design intention of the process deck layout and selected equipment for transport and handling is to obtain a system with the largest amount of automation, assisting the employees working in the processing area.  This arrangement is designed to achieve very high throughput with minimum fish damage, improve employee efficiency all in a clean and safe work area.
     The vessel will be outfitted with three (3) working cranes for various onboard operations.  One (1) aft deck crane is dedicated to work during fishing operations. It’s a 360° deck crane with a telescopic boom with a lifting capacity 6,400 pounds and a maximum working radius of 35 feet. One (1) midship deck crane dedicated as off-loading crane for continuous operation in port is a 360o deck crane with a telescopic boom.  One (1) forward deck crane is also dedicated for continuous operation during off-loading in port is a 360o deck crane with knuckle boom operated by its own hydraulic power unit.
     The vessel will have the latest in EPA emission Tier 3 diesel engine certification.  The vessel is powered by one (1) EMD 16-710G7-Tier 3 diesel engine rated at 4,000 HP at 900 RPM provided by Valley Power Systems, Inc. of Seattle, WA.  The propulsion vertical offset Lufkin reduction gear model VSQ4134HG-K-PTO with a 7.20:1 reduction is Owner supplied.  While underway the Lufkin propulsion gear also drives an ABB 1,700 kW shaft generator at 1,200 RPM which is variable speed, constant voltage and offers a DNV approved floating frequency ranging from 50-60 Hz. This generator provides the vessel with a clean primary electrical power source for utilization of the vessels total installed equipment, winches, processing, fish handling systems, pumps and ships services, etc. The electrical and automation systems are designed by Ockerman Automation Consulting, Inc.
     Secondary electrical power is provided by two (2) 550kW Caterpillar C18 Tier 3 generator sets and emergency power is provided by one (1) 95kW Caterpillar C4.4 Tier 3 emergency generator all are rated for 60 Hz, at 480 vac.  These diesel engines comply with the current EPA/MARPOL control of emissions of nitrogen oxides from marine diesel engines.  The vessel is also outfitted with a Brunvoll 350kW electric tunnel bow thruster.   

    Eastern is a family held shipbuilding company located in Panama City, Florida.  A long-time employer in Bay County for over 40 years, Eastern currently provides jobs for more than 1200 employees. Since 2008, Eastern has spent more than $75 million dollars in upgrading and expanding its facilities and shipbuilding capabilities to continue growing and meeting the needs of its Commercial and Government Customers.  
     
    Eastern Shipbuilding Group, Inc. has two new construction and repair facilities and has been in business since 1976 building new, converting and repairing vessels in steel and aluminum of all types including offshore and harbor/escort tugs, offshore tugs, offshore/platform supply vessels, multi-purpose construction vessels, research vessels, firefighting vessels, barges, dredges, ferries, passenger vessels, fishing vessels and inland towboats. Eastern maintains its role as one of the most diversified and innovative construction shipyards in the United States.  

    Eastern Shipbuilding Group continues to remain a diversified shipbuilder, delivering seventeen (17) vessels of various sizes and designs over the last twelve (12) months. The Freezer Processor Factory Trawler ARAHO maintains Eastern Shipbuilding’s role as one of the largest manufacturers of highly specialized fishing vessels in the United States.
     




21 мая 2024

19:00 ОСК представила цифровую модель судна, созданную на базе отечественного ПО
18:32 Минсельхоз определит общий допустимый улов в районах международных договоров для российских моряков
18:19 Разработан первый в Китае двухтопливный низкооборотный двигатель на метаноле
17:53 Власти Кировской области оценивают экономическую выгоду от речных грузоперевозок
17:31 Рыбакам Черного и Азовского морей до 1 января 2026 года разрешат вести рыболовный журнал на бумаге
17:11 ГТЛК приняла вторую баржу по инвестиционному проекту с использованием средств ФНБ
16:53 В результате подвижки льда на реке Лена затонуло 2 буксира-толкача
16:30 Губернатор: Астраханская область заинтересована в транзите белорусских грузов по морскому маршруту МТК «Север – Юг»
16:16 ГК «Астра Марин» планирует в навигацию 2024 года утроить число пассажиров на маршруте Санкт-Петербург — Крепость Орешек
15:58 В морском порту Махачкала введен в эксплуатацию передний створный знак
15:39 Туапсинский МТП направит на закупку портального крана 700 млн рублей
15:11 Вокруг крупнейшей в России морской буровой платформы планируется установить охранную зону в 565 м
14:57 Александр Козлов: Старт экспедиции «Северный полюс-42» запланирован на сентябрь 2024 года
14:35 Авансирование строительных работ на Багаевском гидроузле предлагается увеличить с 70 до 90%
14:20 ФАС повысит тариф на транспортировку нефтепродуктов по трубопроводам до порта Новороссийск
13:56 Балкер «Витус Беринг» станет первым судном в порту Анадырь (Чукотка) в навигацию 2024 года
13:38 «Петролеспорт» начал обслуживать новый сервис на Калининград
13:07 Астраханский СРЗ спустил на воду спасательный буксир проекта 22870 «Михаил Чеков»
12:39 Контейнерооборот порта Лос-Анджелес в апреле 2024 года вырос на 12% — до 770,3 тыс. TEU
12:33 Пожар на судне в Астрахани полностью ликвидирован
12:17 НКХП увеличил перевалку зерна в апреле 2024 года на 9% — до 726,3 тыс. тонн
11:54 Ожидается возобновление транзита коммерческих судов в порту Балтимор
11:19 На реке Лена с сорванных льдом судов эвакуировано 18 человек
11:15 Центр судоремонта «Звездочка» завершает подготовку колесного парохода «Н.В. Гоголь» к навигации
10:31 На территории судоремонтного завода в Астрахани загорелось судно
10:06 Грузооборот турецких портов в январе-апреле 2024 года вырос на 5,9% — до 179,4 млн тонн
09:35 Администрация «Обь-Иртышводпуть» ввела в обращение новые карты водных объектов
09:12 В Комсомольске-на-Амуре судовладельцы по требованию прокуратуры оформили незаконно занятые земельные участки
08:47 В морском порту Оля прошли тренировочные учения перед утверждением планов ЛАРН
08:23 В терминале Беринговский морского порта Анадырь (Чукотка) открылась навигация
08:00 Действие временного запрета на экспорт бензина из России приостанавливается до 30 июня 2024 года

20 мая 2024

19:00 ПСЗ «Янтарь» приобрел 3 новых аппарата высокого давления для малярного участка
18:44 Флот АО СПК «Дон» планируется пополнить судном «Метеор 120Р к августу 2024 года
18:26 В порту Архангельск изменены тарифы на услуги Росморпорта по предоставлению катеров «Галс» и «Проблеск 2»
18:09 EDGE Group (ОАЭ) и Fincantieri (Италия) создали совместное судостроительное предприятие
17:45 Власти Казахстана пригласили литовских инвесторов к реализации инфраструктурных проектов в портах Курык и Актау
17:17 «Саханефтегазсбыт» завершает подготовку причалов нефтебаз к летней навигации 20224 года
16:38 Начало работы паромных переправ по основным маршрутам Якутии планируется 25-27 мая
16:14 НК «КазМунайГаз» в I квартале 2024 года увеличила морскую транспортировку нефти на 65,2% — до 3,46 млн тонн
15:53 Zhoushan Changhong (Китай) и Horizon Tankers (Греция) заключили контракт на строительство танкеров дедвейтом 50 тыс. тонн
15:29 АО «Транснефть – Сибирь» завершило подготовку речного флота к навигации 2024 года
15:07 НЭС «Михаил Сомов» вышло в первый рейс навигации 2024 года
14:45 Выручка CMA CGM в I квартале 2024 года достигла $11,8 млрд
14:36 Глава СК России ждет доклад о состоянии транспортной инфраструктуры в ЗАТО Фокино (Приморский край)
14:11 Грузооборот порта Хедланд (Австралия) за январь-апрель 2024 года снизился на 3%
13:50 FESCO: Контейнерный рынок России по итогам четырех месяцев 2024 года вырос на 11%
13:32 В целях замещения критических позиций СКО начата реализация 60 комплексных проектов
13:16 Грузооборот порта Вентспилс (Латвия) за январь-апрель 2024 года снизился на 26%
12:45 Портфель заказов ССК «Звезда» до 2037 года составляет порядка 119 судов
12:31 Для нужд Республики Саха (Якутия) в период навигации планируется доставить 1,25 млн тонн грузов
12:12 Трое моряков пропали без вести после инцидента с турецким судном у побережья Румынии
11:50 На реконструкцию Онежского ССЗ будет выделено 2 млрд рублей
11:37 Глава ОСК: Астраханские верфи могут стать центром строительства дноуглубительного флота
11:17 На Беломорско-Балтийском канале стартовала навигация 2024 года
10:53 На Восточной верфи состоялась выкатка из эллинга шестого судна-краболова
10:42 США заподозрили китайские ремонтные суда в шпионаже
10:23 Дноуглубление в Ленском бассейне ВВП на 2024 год запланировано в объеме свыше 2,4 млн куб. м
09:55 На Камчатке появится судоремонтное предприятие для обслуживания маломерного промыслового флота
09:46 Амурский судостроительный завод в июле 2024 года планирует заложить плавучий транспортный док проект 17574
09:24 Торговый оборот Приморского края и КНР по итогам 2023 года вырос на 14,5%
08:50 На Чукотку в навигацию 2024 года планируется доставить 190 тыс. нефтепродуктов и почти 219 тыс. угля
08:23 После опрокидывания маломерного судна на реке Лена возбуждено уголовное дело
08:00 Проект строительства подъездной дороги к Махачкалинскому МТП направили на экспертизу

19 мая 2024

12:09 ОСК и СПбГМТУ внедрят новую систему подготовки инженерных кадров
11:52 Губернатор: Строительство глубоководного района порта Архангельск является флагманским проектом для региона
09:37 Более 100 человек прошли в ОСК обучение по программе «Судометрика»
09:19 Грузооборот морских портов России за 4 месяца 2024 года снизился на 4,3% — до 288,4 млн тонн

18 мая 2024

14:28 Танкер загорелся у берегов Йемена после попадания ракеты
12:09 Судно получило повреждения в районе Йемена
09:01 Введен временный запрет на вывоз отходов и лома драгоценных металлов из России